Description
Great opportunity for investors or developers looking for a profitable and reliable project. The main attraction of this project is the place where it is located. In recent years, Busot has become a highly sought-after destination for people looking to make a change in their lives and live in a natural and peaceful environment without straying too far from the coast or the city. Busot is located in an ideal enclave, being surrounded by a beautiful mountainous landscape and at the same time having the sea just 10 minutes away by car, 25 minutes from the city of Alicante and 35 minutes from the airport. They are two building plots that together add a total of 21951m2. Taking into account the surfaces that must be allocated to the urbanization, the possibility of building 23 independent single-family homes is estimated. The characteristics necessary to be able to build are the following. Minimum surface area of the plot: 800m2 Buildability: 25% Maximum height: 7 meters / two Heights Setbacks: 4 meters to the boundaries and to the road 21 meters to the axis of the CV-773 road 3 meters to one of the boundaries In order to build on the plot, it is necessary to change its classification from developable land to solar.“1. Plots are legally divided or formed plots that, having adequate characteristics for
serve as support for the use assigned by the plan, are also urbanized in accordance with the
alignments, flushes and technical standards established by it.
2. For the plots to have the condition of solar, their endowment will be required, at least, with these services:
a) Road access to them by paved road, which must be open to public use, in good conditions.
adequate, all the ways they face. They do not justify the provision of this service or the rounds
perimeters of the urban nuclei, with respect to the adjoining surfaces with their outer margins,
nor the routes of communication of these nuclei with each other, except in their sections of crossing and from the first
crossing of this one with own street of the urban nucleus, towards the interior of the same one.
b) Supply of drinking water and electricity, with sufficient flows and power for the
planned building.
c) Evacuation of wastewater to the sewage network connected to the water treatment plant
residuals. The evacuation of wastewater to ditches or septic tanks does not justify the provision of
this service. However, in cases where the installation of a system is not deemed justified
collector, either because it does not entail any advantage for the environment or because its installation
implies an excessive cost in relation to the use of individual systems, these may be used
individual systems or other suitable systems that imply a level of environmental protection
equivalent to that achieved through the sewage system connected to the treatment plant.
d) Pedestrian access, curbing of sidewalks and public lighting in, at least, one of the roads that it faces
the plot.
3. The plots subject to an integrated action acquire the status of plot when, in addition to having the
services expressed in the previous section, have executed the minimum integration infrastructures and
connection of the action with its territorial environment, up to the point of connection with the general networks or in the
manner stipulated by the action program for each phase.
4. The status of site is extinguished by its integration in urban reform, regeneration or renewal actions.
that require new land urban transformation operations”
Features
Pool
No
Land
21951m2
Plus...
- Asphalted
- Fenced
- Electricity
- Water